Because of a lapse in government funding, the information on this website may not be up to date, transactions submitted via the website may not be processed, and the agency may not be able to respond to inquiries until appropriations are enacted. The NIH Clinical Center (the research hospital of NIH) is open. For more details about its operating status, please visit cc.nih.gov. Updates regarding government operating status and resumption of normal operations can be found at opm.gov.

Managed by the Office of Research Facilities, Division of Environmental Protection (DEP)

​​​​​

​​

Building 3 Renovation

Sustainability Achievements ​

Achieve LEED Silver certification 
Reduce energy consumption by 20% below the ASHRAE standard 90.1-2007 
  • All building utilities, electricity, water, steam, chilled water, will be metered 
  • Install Energy Star rated equipment where possible 
  • Utilizes energy efficient lighting to include automatic dimming controls, daylight sensors, occupancy sensors and provides manual lighting controls and appropriate glare controls
  • Incorporates high efficiency HVAC equipment and systems 
  • Reduce water use by at least 20% below current codes 
  • Eliminate domestic water use for irrigation through xeriscaping 
  • Install low flow, WaterSense Labeled plumbing fixtures, low flow toilets, low flow urinals, faucet aerators, and low flow motion-sensing lavatory fixtures 
  • Building systems and equipment will be commissioned by an independent third party commissioning team 
  • Eliminates the use of volatile organic compounds and ozone depleting substances 
  • Approximately 10% of the total value of the materials used in the project, based on cost, will include recycled content material 
  • Approximately 2.5% of the total value of the materials used in the project, based on cost, will include bio-based and rapidly renewable material 
  • Project will recycle more than 75% of its construction waste​​

Fig.14- View of Renovated Building 3 (below)​